Customer : Raffinerie Tirlemontoise, Wanze Factory
General contractor : De Smet Engineers and Contractors.
Scope of works : Design, supply, construction, erection and commissioning.
Industrial operation : September 1999.
Plant capacity : 3.200 MTDP.
Processing units : - Continuous crystallisation:
Seed pan followed by 4 classic inter-linked
apparatus installed at the same level.